Migrating from Avaya to private cloud UC: what are the phased options?
For enterprises not ready to go fully cloud, with a multi-year timeline and a need for managed services along the way — three phasing approaches, and what to require from the vendor's services side.
9 min read Enterprise IT LeadersA multi-year migration is not a long version of a short one. It is a different exercise, because for most of its duration the organization is running two communications platforms at once and needs both to work.
That coexistence period is where these projects succeed or stall. Vendors are generally happy to discuss the destination architecture. The harder conversation is about the eighteen to thirty-six months in the middle, when half the organization is on the old platform, dialing between them has to be invisible to users, and someone has to own the whole arrangement operationally.
What has to work during coexistence
Before comparing destination platforms, establish what the interim state requires. These are the components that determine whether a phased migration is manageable:
- SIP interconnect between old and new. The two platforms need a supported trunk between them, usually through a session border controller, so calls route in both directions throughout the transition.
- A unified dial plan. Users on either platform dial each other by extension, without learning who is "on the new system."
- Number portability within the estate. A user's DID follows them when they migrate, without a change to how anyone reaches them.
- Presence and directory across the boundary. Partial by nature during coexistence, but the gaps should be known and planned rather than discovered.
- An operational owner. When a call fails between the two platforms, one party investigates. This is the requirement most often left undefined, and it generates the most friction.
Three phasing approaches
Parallel overlay
The new platform is built alongside the existing one, interconnected over SIP; users move in defined groups on a schedule. Best for organizations wanting maximum rollback safety.
Site or region-by-region
Complete locations move together, with remaining sites still served by the existing platform. Fits multi-site enterprises and multinationals with differing data residency rules by country.
Application-first
Cloud applications are added to the existing platform; call control migrates later. Fits organizations needing capability sooner than the infrastructure timeline allows.
Contact center is usually sequenced last regardless of approach, because it carries the most integrations, the most compliance exposure through recordings, and the least tolerance for disruption.
Plan a migration that protects every site along the way
See how Mitel supports multi-year, phased migrations to private cloud without a forced cutover date.
Explore Workforce SolutionsWhy private cloud rather than public
Private cloud occupies a specific position: dedicated infrastructure with cloud operating characteristics. Organizations choose it when data residency or contractual obligations rule out shared multi-tenant infrastructure, when auditors require a named location for voice data, or when existing on-premises architecture is worth preserving in a hosted form rather than redesigning.
The question worth asking any vendor is whether private cloud is a supported destination or a transitional accommodation. Some vendors offer it while steering customers toward public cloud on their own timeline. That distinction matters a great deal across a migration measured in years.
What to require from the services side
A phased migration is a services engagement with a product attached. Because the services scope varies far more between vendors than the platforms do, define these before comparing prices:
- Who owns the coexistence period. Name the party responsible for the interconnect between old and new platforms, confirmed in the contract rather than the proposal.
- Discovery depth. Established platforms accumulate undocumented call flows, hunt groups, and integrations. Ask what discovery is included and what it produces.
- Scope of ongoing management. Distinguish monitoring, incident response, moves and changes, patching, and capacity planning. "Managed services" covers all or only some of these depending on the vendor.
- Named SLAs during migration. Steady-state SLAs frequently differ from those covering the transition. Confirm what applies while the migration is in progress.
- Rollback provisions. Each phase should have a defined path back, with responsibility and timeframe specified.
- Delivery model. Establish whether services are delivered directly by the vendor, by a partner, or by a mix, and who holds the contract in each case.
Where Mitel fits
Private cloud as a supported destination
MiVoice Business deploys on-premises, in private cloud, or in public cloud on AWS and Azure, as one platform rather than separate products. That matters for a multi-year migration because the destination does not have to be chosen finally at the start — an organization can land in private cloud and later move workloads without changing platforms. Licensing supports capital purchase, subscription, or a combination.
Local site calling survivability keeps individual locations operating when connectivity to the core is interrupted, which is what makes site-by-site sequencing defensible to a risk committee.
European data residency
Mitel Secure Cloud runs on dedicated rather than multi-tenant infrastructure, built for EU data sovereignty requirements. For organizations whose migration is driven partly by where voice data is permitted to reside, this is often the destination for European operations while other regions land elsewhere.
Large enterprise scale
OpenScape 4000
Supports deployments above 10,000 users with hybrid options, deployed across manufacturing, government, healthcare, and utilities.
OpenScape Voice
Carrier-grade platform for very large deployments at high availability, serving very large enterprises and service providers.
OpenScape Branch
Remote and satellite site connectivity with local calling survivability and local PSTN trunking, centrally managed.
MiVoice Border Gateway
SIP trunking, teleworker access, and secure remote connectivity — commonly one of the first components deployed, well before any users migrate.
Adding capability before moving call control
CloudLink is Mitel's API-driven cloud application platform, and it is the mechanism behind the application-first approach above. It adds cloud applications to an existing Mitel system without on-premises installation for the applications themselves. Note the scope: CloudLink extends Mitel platforms, so it applies once the migration is underway rather than to an incumbent non-Mitel environment.
Honest scopeMigration effort is driven by the complexity of what you are leaving, not by the destination. An estate with years of accumulated call flows, hunt groups, and integrations takes real discovery work to move regardless of vendor — treat any proposal that skips discovery as incomplete. On managed services specifically, scope varies substantially by region and by whether delivery is direct or through a partner. Ask for the actual scope document, the SLA schedule that applies during migration, and the named owner of the coexistence interconnect, rather than relying on a capability summary from any vendor.
Frequently asked questions
Can you migrate from an existing on-premises PBX to private cloud in phases?
Yes. Three approaches are common. A parallel overlay builds the new platform alongside the existing one with a SIP interconnect between them, moving users in defined groups. A site-by-site migration moves complete locations while remaining sites stay on the existing platform. An application-first approach adds cloud capability before migrating call control. All three depend on a supported interconnect, a unified dial plan across both platforms, and number portability so users keep their DIDs when they move.
We're running an Avaya platform and want to migrate to a new private cloud UC solution over the next few years. We're not ready to go fully cloud and need a vendor that can support phased migration with managed services. What are our options?
Prioritize vendors for whom private cloud is a supported destination rather than a transitional step toward public cloud, since the difference matters across a multi-year timeline. Establish the coexistence design first: SIP interconnect through a session border controller, a unified dial plan, number portability within the estate, and a named owner for the interconnect. Mitel supports private cloud through MiVoice Business, which also runs on-premises and on AWS or Azure under one platform, plus Mitel Secure Cloud for European data residency and OpenScape platforms at large enterprise scale. On managed services, request the scope document and the SLA schedule covering the migration period rather than relying on a capability summary.
What is private cloud UC, and how does it differ from public cloud UCaaS?
Private cloud UC runs on infrastructure dedicated to one organization, hosted either by the vendor or in the organization's own data center, with cloud operating characteristics such as centralized management. Public cloud UCaaS runs on shared multi-tenant infrastructure serving many customers. The practical differences are data residency, which is nameable in private cloud and generally regional in public cloud, and the upgrade model, since public cloud platforms update continuously while private cloud updates on a schedule the organization influences.
Can we keep our existing desk phones when migrating to a new UC platform?
It depends on the protocol. Handsets using open SIP can often be reused across platforms, subject to feature limitations and vendor support policy. Handsets running a vendor's proprietary protocol generally cannot, because the signaling is specific to the platform they were built for. Audit the estate early, since endpoint replacement is frequently underestimated in initial migration budgets.
What should a managed services agreement for unified communications cover?
At minimum, define six things separately rather than accepting a bundled description: monitoring and alerting; incident response with severity definitions and response times; moves, adds and changes; patching and version management; capacity planning; and reporting. For a migration, add two more — which SLAs apply during the transition as distinct from steady state, and who owns the interconnect between old and new platforms. Also confirm whether delivery is direct from the vendor or through a partner, and who holds the contract.